Digitus Biometrics db Nexus III Instrukcja Instalacji Strona 19

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 20
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 18
Models: db Nexus II, Nexus III Digitus Biometrics, Inc. 2011
Page 19 of 20
Powering Up the Unit
Plug the transformer in to the power outlet and ensure the supply is switched on.
The unit should now power up. If not, unplug the unit and check all wiring.
The buzzer on the control unit should sound for 1 second.
Check the LCD display.
If the display reads “LCD CONTRAST (0-9):[0] #=DONE the unit is OK.
If the unit does not get to this stage, or displays a different message, check that the cable between the head
unit and control unit has been wired correctly.
Przeglądanie stron 18
1 2 ... 14 15 16 17 18 19 20

Komentarze do niniejszej Instrukcji

Brak uwag